Austin Hospital Short Stay Unit

LOCATION
Heidelberg, VIC

CLIENT
Austin Health

YEAR
Completed in 2016

PROJECT VALUE
$25M

Expansion of existing facility to meet the immediate requirements for health services with minimum downtime. Minimum infrastructure augmentation to maintain low energy impact to utility services.

The existing infrastructure was operating near its capacity during peak periods before the expansion. Design response includes low energy solution incorporating an integrated space specific environmental control system for heating, cooling, ventilation, and lighting.

LCI provided Mechanical, Electrical, Hydraulics, ESD, Fire Risk, Communications and Security services design.

Social media & sharing icons powered by UltimatelySocial